Search the Community
Showing results for tags 'selfsourced'.
The search index is currently processing. Current results may not be complete.
-
Hi All, I was encouraged to do a build diary but straight off the bat I am not a document type guy lol . Long story short I was off work for the Christmas holiday period and somehow ended up getting drawn into the Voron world. After watching a few too many youtube videos I decided to jump in at the deep end and started placing orders. Did not opt for a full kit as I wanted some control over what went into the system if I was going to spend this much on yet another "hobby" The parts have started trickling in but due to the order they are arriving I think I may have to wait till its all here to see some real progress. This may end up being a slow build depending on some order delays and how much I can stretch a day. I could not help myself though and started the basic frame ensuring it is all square. Since the rails were also in that order I cleaned them up with 91% IA (what I had at this time) and greased them. I used a grease which was readily available and closely matched the spec for Mobilux EP2 but since I do not really know the consistency(fluidity?) of the Mobilux EP2 this one has the carriage sliding down from top in lets say 2-3 secs. I compared this to a rail I have from a system I tried to build a few years ago and had never cleaned. That carriage drops almost instantly if I flip it vertically. So my question would be with the new ones greased up what kind of movement am I aiming for? Instant drop like the old rail or a consistent slide down the rail? Thanks and hopefully I can keep this thread updated with my progress...will post some parts that have arrived.